 |
 |
| |
 |
|
|
| |
Horizon Tangier
Terminals Ltd
|
The Port of Tangiers is a new
$1.6 Billion development aimed at becoming a competitive
international port, situated to serve Europe, the Americas,
North as well as West Africa. Tangiers lies on
the North African coast at the western entrance to
the Strait of Gibraltar where the Mediterranean meets the
Atlantic Ocean off Cap Spartel. The location of the
new port is expected to enable it to serve more than 300
million consumers through industrial and commercial free
zones. Currently, the port is comprised of three dry
cargo container terminals, and one Ro-Ro and ferry terminal.
The port has received positive international market
feedback. The Tangiers petroleum storage terminal
has several advantages, one of which to help solve the
shortage in storage facilities in North Morocco, which in
turn should help reduce the historical costs associated with
the supply of Gasoil and Motor Gasoline from central Morocco
to the North. This will no doubt contribute to the growth of
the Northern region. In addition to supplying the Northern
requirements, the Tangiers terminal will provide
bunker services as well as serve the transit market for
international petroleum marketing companies. The
importance of the Strait of Gibraltar region to East-West
traffic is partly evidenced by the size of the bunker
market, estimated for 2005 to be six million tons.
Also, The project is located at the crossing of two major
maritime routes, as well as positioned 15 KM from the
European Union. This offers a unique opportunity to
further expand petroleum trading activities.
|
| |
« BACK |
|
Tangier, Morocco |
| Products: |
Fuel oil, Gasoline, Gasoil |
| Tanks: |
Total 508,000 m³
5 x 38,000 m³– Fuel Oil
1 x 14,000 m³ Cutterstock
1 x 14,000 m³ Marine Gasoil
5 x 26,000 m³– Clean products
3 x 38,000 m³– Clean products
2 x 14,000 m³– Clean products
2 x 9,000 m³ - Blending Components |
| Access: |
Vessels & Road Tankers |
| Berth: |
Berth 1 – 30,000 DWT to 150,000 DWT
Berth 2 – 30,000 DWT to 150,000 DWT |
| Berth lines: |
4 x 16” Clean Petroleum Products
2 x 20” Fuel Oil (electrically traced
pipelines).
(All lines are
fully piggable.) |
| Additional Facilities: |
8 Truck Loading bays (Top Loading) for
petroleum products
Rail wagon loading
Blend Plant & recirculation systems |
|
|
|
| ©
Copyright 2006, HORIZON TERMINALS |
|